Friday, August 31, 2012 0 comments

Checking in and checking out....

Hi there!  Just want to check in and wish you all a fabulous weekend.  We will be laying tile in the Master Bathroom this weekend but will also be taking some time to enjoy some good food and family time.  Here's hoping your weekend is just the way you want it. Cheers!

Wednesday, August 29, 2012 0 comments

Milk Paint Furniture..... China Hutch Sneak Peek

So, last weekend I tried milk paint for the first time on a china hutch that I bought for my bathroom. As for the results, I'm really happy with the way it all turned out. I used the driftwood on the back and pitch black on the rest of the cabinet. The only issue I ran into was the paint kept clumping. You have to stir it frequently and well. When I first mixed the paint ( I used warm water per the instructions), the directions say to stir for 2-3 minutes and then let it sit for 10-15 min. Easy enough. After that, I stirred it again really well and then started to apply with a sponge brush. After a short time, it seemed to clump back up so you really have to stir every so often. The finish is very matte and the adhesion is good. I bought the polymer adder for adhesion and added to the paint mix before applying. I did a very rough sand on the cabinet, just enough to dull the shine. After two coats, I lightly distressed it and them applied two coats of Minwax clear satin wipe on poly ( I love that stuff). Keep in mind if you try this, the color will darken up quite a bit with the poly top coat. I knew this and expected it so I was really happy with the results. I put the original hardware on the door but will use different hardware on the drawers.  Not sure if I want to use the pulls from Anthro yet because there's something that's "eh" about it.  Maybe when it gets moved into place in the bathroom it will be clear.  For now, I'll show you the finished piece as is, then I'll show you a pic all done up and pretty.  Here's the before:


 
And here's the after
 
 
 
A couple things to note:  First, we took the top piece of moulding off and replaced it with a smaller piece lower on the cabinet to make the piece lower.  In the bathroom, this doesn't cover the new window but I wanted as much clearance under the new window as possible.  This is as best as we can get and actually I like it better this way.  Also, there is a little piece of moulding missing on the bottom right door panel that I have ready to go back on.  So when I show you the pic of it all pretty, this will be all fixed.  Well, what do you think?  Painting the back a lighter color really makes the shelves pop and it keeps this piece from being really heavy feeling.  I've got another piece of furniture that I'm going to do in Driftwood so I'll share that with you too when I start that project.  Ciao for now!



Friday, August 24, 2012 2 comments

Milk Paint.....

Have you used milk paint before?  I'm about to use it for the first time this weekend on a big piece of furniture.  I bought three colors: Snow White, Pitch Black and Driftwood.   I'm thinking of starting with the black and diluting it just a little with the snow white so it's not pitch black but more of a faded black.  So, what is this furniture piece you ask?  Well, after debating back and forth about built-ins for our Master Bathroom, I decided that I wanted to keep going with the furniture concept so I bought a china cabinet.  I love that this cabinet has the glass door with wood shelves on the top and drawers and extra storage on the bottom. I have some vintage bath accessories and old bottles that I'll display and I want this piece to have an old apothecary feel.   I found some old looking pulls at Anthropologie last weekend that I am going to use instead of the more traditional pulls that are on it now.  The drawers are slightly bow front and offer plenty of storage for the stuff you need but don't want to see and the sides are perfect for housing the trash bin and taller items. So, I'll be experimenting this weekend trying to give this piece of furniture a new look.  Here's what I'll be working with:







 
 
 
 
These are the pulls that I got at Anthropologie to replace the ones that you see on the drawers in the pictures.  These were on clearance and are not available on the website anymore so I'm not linking to it. If you like them and live near an Anthro, go there now.


 
  
Here's what the milk paint looks like.  I'm excited to see how this comes out. 
 
Quick update on bathroom progress.  Flooring will be done over Labor Day weekend.  Our schedule has been packed and we've been doing some floor leveling so that's taken some extra time and $.  But, it was necessary to do and it will be worth it in the long run. We're almost there.  I will not show any more pictures until it's done (maybe just one sneakie peek) so you can see the whole thing completed. 
 
Have a great weekend!
 

 


Friday, August 10, 2012 0 comments

An update and other business....

Happy Friday!  Hope your week has been great.  Let me give you a quick update on the status of the bathroom first.  The plumbers have finished the rough in work and we have the green light for tile.  The Sheetrock is still being worked on and should be completed by Tuesday at the latest (fingers crossed for no delays).  I'm still deciding on paint colors but I'm really leaning to the light/white shades for this room to make it as bright as possible without feeling sterile.  Oh, and Eleanor got a little "work" done and looks fabulous. Besides that, I've been thinking of how I want to decorate the bathroom and I've been looking for a few special pieces.  I have an idea of what I want to do but I'll share that later when it becomes more solid. 

In other news, I've been shopping for a client that I am working with through e-design and I've picked up some neat things along the way that I thought I would share.  I bought some great books from a dealer who knows I love old books. Every once in a while, I sit down and read through some of the books I have and realize that reading was the only form of entertainment for many people back when these were published. Although that is not the case today, these books hold a value of unique craftsmanship and literary history. I hope to one day, read every book I own. But for now, I will admire the artistry in the covers and appreciate the journeys they have been on so far.





 



 


 
That's all for now.  Hope you all have a wonderful weekend!



Monday, July 30, 2012 0 comments

Operation Master Bathroom....Update #2

Happy Monday to you!  Ready to start another fabulous week?  Things here have been buzzing with activity and non-activity.  Let me explain.  On my last post, we left off with the sounds of jackhammering and progress being made.  That is until we got to the tub. The plumbers wanted to wait to mark the drain until the faucet and supply lines came in. The space is very tight where the tub is going and there is no room for second guessing.   I totally get that and agreed so as I was tracking the order which of course was late, I was told by the plumber I ordered them from that the supply lines I ordered would not work with my tub.  He said that I would need to order another set of supply lines to make my faucet work.  This was not good news because that would be an additional  3-5 days since this is all special order.  So with several big holes in the floor, the plumbers left and told me to call them when the supply lines came in and they would come back and finish.  The faucet and wrong set of supply lines came in late on Tuesday and the plumbers came out Wednesday to pick up where they left off.  The idea was to move the tub in the bathroom and do a mock up of where everything was going.  Using the wrong supply lines as a guide, the plumbers determined that the distance was short about 1-1.5" or so.  Which is to say we would have to take the water closet wall down and move it over 1-1.5".  This was definitely not the news we wanted to hear. I called the plumber that I ordered the supply lines from and decided that I was going to return the wrong ones and order the correct set and have them sent overnight.  These were actually in stock so I received them the next day. The plumbers came back out on Friday to do our mock up with the new supply lines and everything fits fine where it's supposed to .  That brings us to today, where they are suppose to be finishing up the rough plumbing so we can get on with things.  Want to see pictures of the tub that's causing all of the drama?  Here she is as a before.  I've named her Eleanor. I'm going to wait another week or so before I have her all cleaned up. 








Actually, she doesn't look all that bad for her age but I'll make sure she looks beautiful again. 

Oh, and I took a picture to show you the mosaic tile that I bought for the shower floor.  The colors in this are muted but they pull a lot of the colors that are in the travertine really nicely. 


 

That's all for now.  Hope you have a wonderful day.



Monday, July 23, 2012 0 comments

Operation Master Bathroom Update.....

Happy Monday friends!  Hope you had a fantastic weekend.  Things have been busy over here and HH has been busting his booty trying to get things framed and ready for the plumbers. The plumbers started today and as I am typing this, they are jack hammering away.  Estimated time for plumbing work is 3 days.  I've ordered all of the fixtures for the tub and the shower faucet and some other odds and ends for plumbing and ventilation and they should all be delivered in the next day or so. After the plumbing is complete, we will put the Sheetrock up on the walls and start the floor. With the water closet wall, the shower wall and the windows in, you can start to see the vision of how this bathroom was designed and I'm loving it. We did have a little snafu with the windows over the weekend and due to factors beyond our control, we were not able to put 3 picture windows in like we wanted.  So that changed the shower wall to being a full height wall rather than the 3/4 wall we were originally going to do. To be honest, I like the full height shower wall better and think it will look nicer when completed.  It also provided us the option to put the shower plumbing on the new shower wall side which we liked better.  Why?  The main reason is if we ever needed to repair the plumbing or add plumbing down the road, that wall will make it much easier to get to.  So, overall it all worked out for the best.  I took some pictures this morning to show you the latest.  Here's where we are in this project:




This is the shower.  It really is amazing how much light these little windows  (13" square) pull in. 




This is just to the right of the shower.  This is where the built in storage will be.





The water closet is where the light is.  The tub will be in between the water closet wall and the shower.  Basically over the hole in the floor.





Here's the table along the wall where the old vanity was. The table is going to stay here and was put here for reference for the plumbers. Can't wait to see this all done. 

One more thing, the mosaic tile that I showed you in my previous post that I wanted for the shower floor was $17 for a 12 x 12 sheet (or square foot) plus freight.  I would need about 20 pieces. I really didn't want to spend that much on the shower floor, so I went  back to Floor and Decor (that's also where I got the travertine) and found a comparable flat stone mosaic for $6.99 a sheet.  Actually, I like this one better because it has the same shades of taupe and cream and white that the travertine has but also has a transparency to it that makes it really neutral.  Not to mention, the price is more in line with what I wanted to spend.  I'll show you pictures of that in my next post. 
Friday, July 13, 2012 0 comments

Operation Master Bathroom...The Plan

Happy Friday!  Hope you have wonderful plans for the weekend ahead.  We are going to be finishing up the demo in the Master Bathroom and then hopefully begin to re-construct with the new plan.  After much deliberation, we have come to a plan that incorporates everything we are wanting in this bathroom.  HH insists on having a water closet and I am not budging on the pedestal tub.  Of course, the pedestal tub is going to take up about 70" of valuable bathroom space but it will be worth it for me when it's completed.  For those of you who love to take baths, you know what I mean.  For those that love a good shower, this bathroom will not disappoint.  We have included a shower that is worthy of a Master Bathroom without being super sized.  Overall, this design makes good use of space and still gives a feeling of openness which makes us both happy.  Here's the floor plan.




This is the plan we decided on.  On the back wall where the shower is, we will install several small windows up high to let in some natural light.  These will provide privacy and let in the morning light which will make a big difference.  Just to the right of the shower will be built ins to store towels and bathroom stuff. This will be the only storage in this bathroom since we opted for the table and vessel sinks rather than the vanity.  I'm good with that and feel like the storage space will be more than enough. 

Now that the floor plan was decided, it was time to decide on the bigger things.  Like the floor itself.  I've always wanted a bathroom in carrera marble but wasn't sure that it would be this bathroom. As I said before, my mind was open to all options on tile.  While I was out looking last weekend, I came across some travertine that I thought might work.   Unlike most travertine, this one has the cool tones of taupe, white and creams and it was just the colors I was looking for. I bought a sample piece and brought it home to make sure HH liked it.  He loved it. It's called pewter crystal travertine and it's really beautiful.  We are going to do the floor and shower walls in this and thought the bigger size of 16 x 24 would look great in this bathroom. Here's a pic of the travertine..




This tile has a lot of interest and the marbling of colors is really pretty.  This is a porous tile that is not filled (see the holes in it) and also has the chiseled edges which gives it an old antique feel.  We have been looking for something for the shower floor that compliments this but I have not decided on anything yet.  I have a sample of a cream colored flat stone mosaic from Dal Tile that is a good contender but I'm going to keep looking just in case.  Here's what the mosaic tile looks like with the travertine....


 


 As for the bathroom itself, demo is almost complete with the exception of chiseling the mortar off the slab from the tiles that were removed.  That should be completed on Saturday.  After that, it will be putting in the windows and building the shower wall to get ready for the plumbers.  Hopefully they can start in the next week or two.  Here's what our bathroom looks like now....











So, that's the plan.  I am excited to see this turn into the beautiful bathroom that I know it can be.  I will keep you updated of the progress as we go along.  Hope you have a fabulous weekend.  Until later..................

 
 
;